AVRIO TECHNOLOGIES

Welcome to Avrio — Choose your preferred language

ඔබ කැමති භාෂාව තෝරන්න

← AV POWER BOX

Freezer & refrigeration backup

Plan backup for selected refrigeration loads in meat shops, chicken outlets, frozen-food stores, cafés and mini supermarkets. Start with the equipment that matters most during an outage.

Check my load
AV POWER BOX 6kW 8kWh NMC Smart Mobile Energy System by Avrio Technologies

Running watts are only the beginning

A compressor can need substantially more current when it starts than while it runs. Record each model, rated running input and Compressor Starting Current. Avrio must assess starting loads and simultaneous restarts before confirming suitability; a low running total alone is not approval.

Build a refrigeration load list

Include freezer cabinets, display chillers, controllers and any essential lighting. Note defrost heaters, operating hours, door-opening patterns and whether several compressors restart together. Use measured watts where available; do not enter cooling capacity as electrical input.

Plan around your stock and operating routine

Load cycling and operating conditions affect energy use. The calculator uses your entered running watts for the full requested time and does not assume a duty-cycle saving. No fixed number of freezers or runtime is guaranteed. Maintain your own food-storage procedures.

Larger sites need selected-load planning

For supermarkets and cold rooms, identify selected critical loads first. Whole-site backup needs measured data and engineering review. Send equipment nameplate photos and a load list for a refrigeration assessment.

Bring this to your assessment

  • Freezer and compressor model/nameplate photos
  • Running Load and starting-current information
  • Number of units that restart together
  • Required Backup Time and recharge opportunities

AVPB-6K-8N / LOAD PLANNING

Is AV POWER BOX a potential match?

6 kW rated AC output. 8 kWh nominal NMC storage × 80% = 6.4 kWh nominal usable energy before losses. Enter actual electrical input, not cooling capacity. All listed loads are assumed to run together for the continuous-load check.

Equipment 1

Actual runtime depends on conversion losses, load cycling, battery condition, operating conditions, charging availability and equipment behavior. Final suitability must be confirmed by Avrio Technologies.